Arncliffe Tunnel Works

Arncliffe Tunnel Works
(Motorway Operations Complex 2 – Bexley Site – B04 Tunnel Rectification Works)

Client: Dragados Samsung Joint Venture

Contract value: $1 million

Scope of works:

  • Survey of Existing Slab
  • Saw cutting of existing concrete and breaking out with heavy breaking equipment to provide drainage system to the bottom vent shaft slab to remove ponding of water due to incorrect concrete slab levels
  • Disposal of Materials